This HPC bridge in Ohio spans 116.5 ft (35.4 m). Using HPC allowed this
long span , which resulted in a single span bridge instead of the three
spans in the bridge that was replaced. The longer span eliminated two piers
in the water.
For more information on this bridge, please see: Miller, Richard A., "From
Three Spans to One with HPC," HPC Bridge Views, No. 4, July-August, 1999,
p. 5.